HVAC Case Study: Office (DVM S Water) | Samsung
지금 보고 있는 영상
HVAC Case Study: Office (DVM S Water) | Samsung
조회수 4,737
영상 설명 · 눌러서 펼치기
This video shows that Samsung DVM S Water was selected as the optimal HVAC solution for TORRE QUAD, the new workspace of Liverpool, one of Mexico's most trusted retail groups for over 175 years.
The water-cooled DVM S Water allows the outdoor unit to be installed indoors, maintaining a clean exterior while maximizing rooftop space. By reusing wastewater as cooling tower circulation water, it also contributed to achieving LEED Gold® certification.
A customized solution with Duct S in main work areas and 360 Cassettes in meeting rooms enhanced both employee comfort and operational efficiency.
Q: What differentiates Samsung DVM S Water at TORRE QUAD?
A: Samsung DVM S Water allows outdoor units to be installed indoors, helping maintain a clean exterior while maximizing rooftop space. It also supports efficient building operation through its water-cooled system design.
00:26 Water-cooled Solution
01:15 Zone-based Custom Control
01:57 LEED-certified project
#DVMSWater #OfficeHVAC #DuctS #360Cassette #WaterCooled #LEEDGold
#Mexico #MexicoCity #Liverpool #TorreQuad #BuildingSolutions
#HVACCaseStudy #HVAC #SamsungHVAC #HVACSolutions
#AirSolution #Airconditioner #AirConditioning #Samsung
The water-cooled DVM S Water allows the outdoor unit to be installed indoors, maintaining a clean exterior while maximizing rooftop space. By reusing wastewater as cooling tower circulation water, it also contributed to achieving LEED Gold® certification.
A customized solution with Duct S in main work areas and 360 Cassettes in meeting rooms enhanced both employee comfort and operational efficiency.
Q: What differentiates Samsung DVM S Water at TORRE QUAD?
A: Samsung DVM S Water allows outdoor units to be installed indoors, helping maintain a clean exterior while maximizing rooftop space. It also supports efficient building operation through its water-cooled system design.
00:26 Water-cooled Solution
01:15 Zone-based Custom Control
01:57 LEED-certified project
#DVMSWater #OfficeHVAC #DuctS #360Cassette #WaterCooled #LEEDGold
#Mexico #MexicoCity #Liverpool #TorreQuad #BuildingSolutions
#HVACCaseStudy #HVAC #SamsungHVAC #HVACSolutions
#AirSolution #Airconditioner #AirConditioning #Samsung
Samsung 다른 영상
Samsung SSD Brand Manifesto Film | Choose the Sure Thing
조회수 17,259
2026 Neo QLED: Feature Film | Samsung
조회수 28,877
2026 OLED(S90H): Feature Film | Samsung
조회수 49,079
2026 Mini LED(M80H) : Feature Film | Samsung
조회수 32,501
8th Gen Foldables | Galaxy Z Fold8 Ultra and Fold8 | Samsung
조회수 47,060
Voices of Galaxy: Paddling for the Future | Samsung
조회수 16,972
Hope Unfolds | Galaxy Z Fold8 | Samsung
조회수 129,201
2026 OLED(S95H): Feature Film | Samsung
조회수 78,607