Keeping wind turbines running takes more than building them.
지금 보고 있는 영상
Keeping wind turbines running takes more than building them.
조회수 22,212
영상 설명 · 눌러서 펼치기
At a wind farm in Inner Mongolia, a SANY 2400t all-terrain crane supported the inspection and servicing of three 100m tall wind turbines by safely lowering key components from the tower.
Supporting renewable energy, long after installation is complete.
#SANY #HeavyLifting #SANYTech #RenewableEnergy
Supporting renewable energy, long after installation is complete.
#SANY #HeavyLifting #SANYTech #RenewableEnergy
SANY Group 다른 영상
One Moon. One Team.
조회수 503
The best way to solve downtime is to prevent it.
조회수 309
Tight space shouldn’t mean constant repositioning.
조회수 670,702
A service call comes in just after the heavy rain. 160 km away, Rahmat is already on the move.
조회수 567
Racing Against Downtime in Indonesia’s Kalimantan
조회수 384
China Trip 2026 | The Journey Begins!
조회수 276
Day 1 & 2 at Mining Indonesia 2026 | SANY Keeps the Momentum Going 🔥
조회수 656
Two Days into Electra Mining Africa 2026 — and the momentum continues.
조회수 1,635